Huntstown Phase II, Dublin, Ireland

1D2O6304.JPG1 1D2O6303.JPG1D2O6308.JPG

 

Client: VIRIDIAN
Location: North County Dublin, Ireland

Shanahan Engineering was awarded the Main Construction Management Contract for the 400MW Huntstown Phase II Power Project. Shanahan was responsible for the overall project coordination including civil, mechanical, electrical, QA/QC, planning, safety and commissioning of the plant along with the installation of the HRSG, Power Train, Balance of Plant, Electrical works and Instrumentation & Control.

For the HRSG Mechanical Erection section of the project, we provided a team of Managers, Technical Advisors, Technicians and Craft Labour to execute the construction of the HRSG from construction and hydro-test through to commissioning of the HRSG.

During the Centreline Installation, Shanahan executed the following:-
• Melco Generator build-out
• MHI M701 gas turbine build out
• HP, IP & LP steam turbine on site assembly
• Air Inlet Filter House construction
• Construction and hydro-test of lube oil, seal oil, jacking oil and control oil systems
• On site assembly of main steam valves

We were also responsible for the erection of all Balance of Plant systems and pipe-work including:-
• Installation of all Balance of Plant pumps and equipment
• Installation of CCCW systems including erection of CCCW fans and structure
• Installation of waste water treatment system
• Installation of auxiliary boiler
• Installation of sampling system
• 34 weld procedures were also qualified on site during this erection contract
 

 