Shanahan Engineering were contracted on a Long Term basis to provide Technical Direction for Mechanical and Control System upgrades on Gas Turbine driven Gas Compressors, with Mk II & Mk V Speedtronic control systems. Services included the final Commissioning and Start up of upgraded the equipment.