Client/ Owner: Enka
Project Location: Bursa, Turkey
Shanahan Engineering was contracted to provide Construction Management and Technical Direction services for the construction of two multi shaft MHI 701F Gas Turbines in Combined Cycle with two MHI Steam Turbines and two MHI Kobe HRSGs. The Gas and Steam Turbines were assembled on site from component form delivery condition, as illustrated in the photograph. Shanahan Engineering’s responsibilities included overseeing the assembly of the main equipment from installation through to commercial operation. Shanahan Engineering was also contracted to produce detailed Erection and Commissioning Procedures Manuals for the main equipment.